This work will start at 7:30 a.m. Monday, 18 July and will be concluded no later than 5 p.m. Friday, 22 July. Please note the following:
- For the duration of this work, vehicle access to the drop-off will be blocked at Earl Clements Dr.
- The work will only affect vehicle access. The sidewalk access from Earl Clements Dr. to the Recreation Center entrance will be maintained.
You will still be able to access Eagle Lake and parking at Eagle Lake Apartments.
NOTE: As a part of this work, fire and domestic water supply to both the Recreation Center and the Eagle Lake Apartments is currently scheduled to be shut down on Wednesday, 20 July, from 7:30 a.m. to 2:00 p.m.
Facilities Management will
be conducting a steam outage, on Monday July 18 at 8 a.m. and lasting until
late evening on Friday, July 22.
There will be no hot water
in any campus building, with the exception of; Third St. Eats, The President’s
House, West Mignon, East Mignon, Mignon Tower, Mignon Hall, Fields Hall, and
Eagle Lake Apartments.
This is for our annual
state boiler inspection.
The Recreation and Wellness Center will be open during this time, however, the pool will be closed from 2 p.m. on Friday July 15 until August 11 for maintenance projects. The summer hours of the facility are listed on their website, http://www.moreheadstate.edu/campusrec/.